Relocation of Bowe sorter @Sameday, Budapest 2024. GoLive in just 10 days!

by Dasstec
16 October 2024
Relocare sorter Bowe @Sameday, Budapesta 2024. GoLive în doar 10 zile!1
Logo Dasstec
a Win Win Company

Relocation of Bowe sorter | GoLive in just 10 days

Relocating a conveyor system from one warehouse to another is a major challenge in terms of human resources, logistics and recommissioning. However, our team manages to complete these processes quickly and efficiently without compromising on quality.

Relocare sorter Bowe @Sameday, Budapesta 2024. GoLive în doar 10 zile!2

Relocate sorter from one warehouse to another

A recent example is the relocation of a Bowe system from one warehouse to another in Budapest for our client Sameday, a project completed in just 10 days. With excellent coordination and an experienced team, we guarantee the systems are back up and running in the shortest possible time, minimizing the impact on operations.

Thank you BOWE and SAMEDAY for the great team!

one Stop Shop

We Plan Relocation

Although the relocation operations of such systems are complex, Dasstec specialists work in a planned and organized way. This ensures that the entire system is back in operation as quickly as possible. Conveying systems can be from the simplest to the most complex, we have all the experience needed for these operations. At customer's request, we can provide lifting elements such as cables, belts, transport rollers, etc. Relocation of equipment can be done in the same production hall. We also relocate to different locations and/or cities than the location from which the equipment leaves. We plan together the best timing and time management so that production on that equipment/system is resumed as soon as possible.

Relocare sorter Bowe @Sameday, Budapesta 2024. GoLive în doar 10 zile!3
Relocare sorter Bowe @Sameday, Budapesta 2024. GoLive în doar 10 zile!4

We ensure the entire relocation process

→ we take over the theme with all data from the customer
→ on-site analysis of the system requiring relocation
→ project strategy and tendering 
→ planning of the team and equipment needed
→ coordination of the project with the client
→ start the decommissioning, dismantling and storage operations
→ electrically, mechanically dismantle, label and organize all elements so that reassembly is efficient and correct
→ packing and loading of dismantled equipment and components
→ transport of systems
→ unloading, mounting, positioning and adjusting
→ commissioning the equipment
→ signing the system commissioning document.